l

   
Project Division

To achieve the objectives of C.G.R.V.V.N., suitable forest areas have been transferred, on lease, by the State Forest Department to the Nigam from time to time. As on today the total forest area with CGRVVN is 1,97,157.133 hectare The forest area leased out to the Nigam is distributed in 6 Project Divisions as per details given below :-

Barnawapara Project Division, Raipur

Contents

Formation
Objectives

Composition

Plantation

Hi- Tech Plantation

Nurseries

 

FORMATION

Barnawapara Project Division, Raipur  was formed in the revenue district of Raipur in terms of notification no. 5131-4114-X(2)75 dated 30-10-1975 issued by Govt. of Madhya Pradesh.

OBJECTIVE

a.  To improve the quality and productivity of the forests in 
     the  project areas of the Raipur district.

b.  To raise plantations of teak ,bamboo and other Misc.Species

COMPOSITION

The total forest area  35,201.471 ha. of  the division is divided into  5 Ranges, 15 Sub Ranges, and 33 beats. The central nursery of the Division is located at Raikera and  the Timber Depot at Birkoni.

Raipur

Barnawapara Project Division

PLANTATIONS
Commercial plantation of Teak, Bamboo and other species was started in the year 1976 and so far the Division has undertaken the plantation in 29039.880 ha. area. 

Year (s)

Teak

Bamboo

Misc.

High-Tech Teak

Total

1976 to 2000

14100

4328

2580

35

21043

2001 

810

-

-

-

810

2002

1045

-

-

-

1045

2003

890

-

-

-

890

2004

1142

-

-

-

1142

2005

1123

 

-

-

1123

2006

608

310

-

-

918

2007

735

225

-

-

960

2008

-

-

-

-

-

2009

-

-

-

-

-

2010

-

-

-

-

-

2011

635

-

-

-

635

 

HI-TECH PLANTAION - TEAK

Since 1997, the Nigam is raising Hi- Tech Teak Plantationswith the following aims :-

1.KKKKMaximizeproduction in minimumtime.
2 .           Enhanceproductivity per hectare.

Year

Plantation Area (ha)

1997

TY10.00

1998

10.00

1999

15.00

Total

35.00

 

3-3

High-Teck Teak Plantation 1999

High-Tech Bamboo Plantation 2000

NURSERY
The Central Nursery of Barnawapara Project Division is located at Raikera, about 70 Km. from Raipur. The nursery produces more than 25 lakhs plants per year. It is equipped with tube wells, sprinklers and other irrigation systems and this nursery caters to the planting stock requirement of the Division. Progress  of the last 5 Years is given below :-

N-Raikera1

Teak plans in Raikera Nursurey

      Year

No. Seedlings Produced in the  Nursery

Teak

Bamboo

Miscellaneous

2001

166000

-

-

2002

2799000

-

-

2003

2523000

-

-

2004

3570000

-

-

2005

3251000 

-

-

2006

1500000

280000

-

2007

4567000

175000

200000

2008

3503675

-

-

2009

2339832

-

-

2010

154700

50500

164003

2011

1935700

-

-

As per the Bio-fuel policy of the State Government 9.0 lakhs Jatropha plants were also prepared during the year 2005 in addition to the Teak planting stock.

1

Jatropha plants in Raikera Nursery


 

 

 

 

Panabaras Project Division, Rajnandgaon
Contents
Formation
Objective
Composition
Plantation
Hi-Tech Plantation
Nurseries

FORMATION

Panabaras Project Division, Rajnandgaon was formed in the revenue district of Rajnandgaon in terms of notification no. 3-111/76/2/10 dated 17-12-1976 issued by Govt. of Madhya Pradesh.

NANDGAON

PANABARAS PROJECT DIVISION

 

OBJECTIVE

a.   To improve the quality and productivity  of the forests in the project areas of   the Rajnandgaon district.

b.   To raise plantations of teak, bamboo and other Misc.Species

 

COMPOSITION

The total forest area  49909.824 ha.  of  the division is divided into  6 Ranges, 15 Sub Ranges, and 35 beats. The two central nurseries of the Division are located at Khadagaon and Koraldand and the two Timber Depots are at Mohala and Balod.

 

PLANTATIONS

Commercial plantation of Teak, Bamboo and other species was started since 1976 and so far the Division has undertaken the plantation in 33214.024 ha. area.

Year(s)

Teak

Bamboo

Misc.

 High-Tech-Teak

Total

1977 to 2000

17344.692

7807.054

28.550

30.000

25130.30

2001

428

-

-

-

428

2002

931

-

-

-

931

2003

906

-

-

-

906

2004

1110

-

-

-

1110

2005

727

-

-

-

727

2006

848

285

-

-

1133

2007

404

819

-

-

1223

2008

476.945

 

-

-

476.945

2009

379

-

-

-

379

2010

226

-

-

-

226

2011

150

-

-

-

150

6

Teak planting stock-  Koraldand Nursery

78000Jetropha plants were preparedby theDivision during the year 2005

Jatropha Plantations-2005

 

 

 

Kota Project Division, Bilaspur
Content 3
Antagarh Project Division, Bhanupratappur
Content 4
Kawardha Project Division, Kawardha
Content 5
Sarguja Project Division, Ambikapur
Content 6
Industrial Plantation Division, Korba
Content 7
Details of the Project Division
Name of the Project Division Date of Constitution Transferred Forest Area (ha.)
Barnawapara, Raipur 30-10-1975 335201.471
Panabaras, Rajnandgaon 17-12-1976 49909.824
Antagarh, Bhanupratappur 17-12-1976 42744.230
Kawardha 12-09-2003 20957.198
Kota, Bilapur 30-10-1975 28062.658
Sarguja, Ambikapur 12-09-2003 20281.753
Industrial Plantation, Korba 23-08-2001 Areas are transferred temporarily for raising plantations in industrial areas

Total

  1,97,157.133
 
 
    © 2012-13 www.cgrvvn.com, All Right's Reserved